
PDF review in Arcture: mark up, assign and validate every correction
Reviewing a project on paper works until the correction leaves the desk. In Arcture, the review happens on the PDF itself: every mark becomes an item with an assignee and a due date, whoever fixes it knows it is their turn, and nothing counts as resolved before someone checks the new version.
This guide shows the whole path, from the first mark to the completed round.
Who can do it: anyone with “Can edit” access, an Administrator or the Owner. The review opens on a computer or a tablet; on a phone, the sheet is too small to mark up.
1. Open the PDF and start the review
- In “Files”, open the project's folder and click the PDF. Only PDFs among a project's files can be reviewed.
- In the file's panel, under “Reviews”, click “Start review”.
The review opens with the sheet in the middle, the marking tools at the top and the correction items at the side. Each round gets a number: Review 1, Review 2 and so on.
2. Mark up the sheet and create the items
Choose a tool (pin, text, arrow, rectangle, circle, freehand or highlight) and draw on the sheet. Then click “New item”: the marks you just made go into it. Give the item a title that says where and what, and choose the assignees and the due date.
Three habits make a difference:
- One item per correction. That way each one has its own assignee, due date and history.
- A mark without an item notifies no one. It is only a drawing until it goes into an item.
- Want to follow it in the task list? Turn on “Create a project task”: the task is born with the item's assignees and due date, and it is completed when the item is validated or discarded.
3. Whoever fixes it gets the turn
The person assigned finds the item under “Your corrections”. They click “Start correction”, fix the drawing in the usual software and use “Upload corrected version” to send the new PDF, which becomes a new version of the same file. When they are done, they click “Mark as ready”.
The item shows where things stand at every moment: “Pending”, “In correction”, “Ready to check” and, at last, “Resolved”. Nobody needs to ask how it is going.
4. Compare the versions and validate
When the item is “Ready to check”, it is the reviewer's turn. In the file's panel, “Compare versions” shows the reviewed version and the corrected one side by side, overlaid or with a swipe, and lists the areas that changed: new, removed or modified content.
If the correction is right, click “Validate” and choose the checked version: the item becomes “Resolved”, with the version it was validated in. If something is still missing, “Return to correction” gives the turn back to whoever fixes it. An item that no longer makes sense can be discarded, and reopened later if needed.
5. Complete the round
With every item validated or discarded, click “Complete review”. The round is kept for reference, with the marks, the comments and the history of each item. At the next delivery, a new review starts on the latest version of the file.
The progress of every round is in the project's “Reviews” tab. The method behind it, which works with or without Arcture, is in the guide on revision control.







